Thursday, 15 December 2011
Spanish water treatment firm Acciona Agua has announced that it will develop solutions for transporting iron concentrate for Chilean miner CMP, which is 75 percent owned by Santiago, Chile-based iron and steel company CAP Group, to carry out water conduits and iron ore concentrate project works related to the Minero Cerro Negro Norte Project located in the Copiapó Valley, in Chile's Atacama Region III.
According to the release, the contract involves the development of an integrated solution for the pumping of iron ore concentrate from the mining operation to the Punta Totoralillo port. It will also use a steel pipeline and a pumping in series system from the desalination plant, located on the coast, to provide water for the mining operations.
The budget for the project comes to US$143 million and the plant is expected to come into service in 2013. CMP is currently advancing Cerro Negro Norte's detailed engineering works. When completed, the mine will produce four million mt of iron ore concentrate annually over a period of 19 years.
Tags: iron ore , raw mat , Spain , Chile , Europe , South America , production , mining , European Union , Mediterranean
Sourced: SteelOrbis
Showing posts with label Cerro Negro Norte iron ore project. Show all posts
Showing posts with label Cerro Negro Norte iron ore project. Show all posts
Thursday, December 15, 2011
Acciona to build iron ore transport system for Cerro Negro Norte
Wednesday, October 5, 2011
Cerro Resources releases initial inferred haematite iron ore resource in Mount Isa
Wednesday, 05 Oct 2011
Cerro Resources has released an initial inferred mineral resource for its Mount Philp Haematite Iron Prospect in the Mount Isa region of Queensland.
Cerro completed a detailed program of geologic mapping, surface rock-chip sampling and partial drill testing of Mount Philp to enable it to develop initial resource estimation.
Based on the program, Cerro has identified a resource of 25 million tonnes grading 36% iron and 45% silica. The deposit occurs as a single north-northeast trending iron-rich stratigraphic unit extending over 4 kilometres.
Drill density was sufficient to define the continuity and shape of the ironstone body, but insufficient to map short scale grade variations within the ironstone, hence the resource is classified as inferred.
Preliminary metallurgical testwork conducted in 2010 on samples from within the inferred resource model indicated the ability to produce a high grade, 68% iron product using the flotation method to remove silica.
This would allow Cerro to process all material within the resource, regardless of silica content and produce an iron ore grade product. In addition to its Mount Isa iron ore activities, Cerro has interests in two projects in Mexico, the Cerro dal Gallo gold-silver project, currently in development and the Namiquipa silver exploration project.
(Sourced from www.proactiveinvestors.com.au)
Cerro Resources has released an initial inferred mineral resource for its Mount Philp Haematite Iron Prospect in the Mount Isa region of Queensland.
Cerro completed a detailed program of geologic mapping, surface rock-chip sampling and partial drill testing of Mount Philp to enable it to develop initial resource estimation.
Based on the program, Cerro has identified a resource of 25 million tonnes grading 36% iron and 45% silica. The deposit occurs as a single north-northeast trending iron-rich stratigraphic unit extending over 4 kilometres.
Drill density was sufficient to define the continuity and shape of the ironstone body, but insufficient to map short scale grade variations within the ironstone, hence the resource is classified as inferred.
Preliminary metallurgical testwork conducted in 2010 on samples from within the inferred resource model indicated the ability to produce a high grade, 68% iron product using the flotation method to remove silica.
This would allow Cerro to process all material within the resource, regardless of silica content and produce an iron ore grade product. In addition to its Mount Isa iron ore activities, Cerro has interests in two projects in Mexico, the Cerro dal Gallo gold-silver project, currently in development and the Namiquipa silver exploration project.
(Sourced from www.proactiveinvestors.com.au)
Tuesday, February 22, 2011
AMEC awarded EPCM contract for Cerro Negro Norte iron ore project

Tuesday, 22 February 2011
International engineering and project management company AMEC has announced that it has been awarded an engineering, procurement and construction management (EPCM) contract by mining company Compañía Minera del Pacífico, a subsidiary of Chilean steel and iron ore producer Grupo CAP, for its $574 million Cerro Negro Norte iron ore mining project near Copiapo in Chile.
AMEC reckons the award strengthens its position in the expanding global iron ore industry. The company will play a vitally important part in developing the 27,000 mt per day operation.When completed, the Cerro Negro Norte iron ore mine will produce four million mt of iron ore concentrate annually over a period of 19 years. Work on the project will begin immediately and commissioning is scheduled to start in the first quarter of 2013.
AMEC reckons the award strengthens its position in the expanding global iron ore industry. The company will play a vitally important part in developing the 27,000 mt per day operation.When completed, the Cerro Negro Norte iron ore mine will produce four million mt of iron ore concentrate annually over a period of 19 years. Work on the project will begin immediately and commissioning is scheduled to start in the first quarter of 2013.
The value of AMEC's contract has not been announced.
ags: iron ore, raw mat, Chile, South America, investments, mining
Subscribe to:
Posts (Atom)
